Key Performance Indicators on the TFL Road Network

Selected key performance indicators on the TFL Road Network.

Number of hours of Serious and Severe Disruption on the road network by planned and unplanned status, journey time reliability, and total number of works undertaken on the road network.

TLRN = TFL Road Network
The maximum permissible total number of road works allowed on the TLRN has been capped at 3,753 in any one period - from period 7 of 2011/12 till the end of the financial year 2012/13, a reduction of 10% from the cap of 4,170 that applied to the first 6 periods of 2011/12.
The key measure for monitoring smoothing traffic flow is journey time reliability. It is defined as the percentage of journeys completed within an allowable excess of 5 minutes for a standard 30 minute journey during the AM peak.

  • Serious congestion. There is traffic congestion that is unusual for the time of day at the location or in an area and traffic has been stopped for less than 5 minutes - but in excess of the red signal time displayed on the traffic signals operating on the road.
  • Severe congestion. There is traffic congestion that is unusual for the time of day at the location or in an area and traffic has been stopped for more than 5 minutes; and traffic queuing is longer than normal for the time of day, more than for ‘serious’ congestion.

TFL also publish annual reports on road safety here.

Cite this as

None (2023). Key Performance Indicators on the TFL Road Network [Data set]. University of Glasgow. https://doi.org/10.20394/ur43h92n
Private DOI This DOI is not yet resolvable.
It is available for use in manuscripts, and will be published when the Dataset is made public.

Additional Info

Title Key Performance Indicators on the TFL Road Network
Alternative title
URL key-performance-indicators-tfl-road-network
Description

Selected key performance indicators on the TFL Road Network.

Number of hours of Serious and Severe Disruption on the road network by planned and unplanned status, journey time reliability, and total number of works undertaken on the road network.

TLRN = TFL Road Network
The maximum permissible total number of road works allowed on the TLRN has been capped at 3,753 in any one period - from period 7 of 2011/12 till the end of the financial year 2012/13, a reduction of 10% from the cap of 4,170 that applied to the first 6 periods of 2011/12.
The key measure for monitoring smoothing traffic flow is journey time reliability. It is defined as the percentage of journeys completed within an allowable excess of 5 minutes for a standard 30 minute journey during the AM peak.

  • Serious congestion. There is traffic congestion that is unusual for the time of day at the location or in an area and traffic has been stopped for less than 5 minutes - but in excess of the red signal time displayed on the traffic signals operating on the road.
  • Severe congestion. There is traffic congestion that is unusual for the time of day at the location or in an area and traffic has been stopped for more than 5 minutes; and traffic queuing is longer than normal for the time of day, more than for ‘serious’ congestion.

TFL also publish annual reports on road safety here.

Content
Subjects
Topics
Dataset Citation
Time Period Coverage
Geographical Coverage
Spatial Units
Observation Units
Resource Type
Data Format
Weighting
Method of Collection
Collection Status
Dataset Aggregation
Data Owner
Data Owner Url
License
Licence Specifics
Provider 9fb98325-4f29-48d8-957c-1825c34d8566
Version
Dataset Available
Dataset Closed
Dataset Valid
Dataset Updating Frequency
Dataset Next Version Due
Date Published 2023-11-06
Date of Fieldwork
Dataset File Type
Dataset File Size 0
Dataset Creation Date
Dataset Access Restrictions
Metadata Created Date
Metadata Created Institution
Dataset Fields (0)